This month Portland Public Schools, community leaders, current and former students, designers and contractors celebrated the groundbreaking for a major renovation of Portland’s 105-year-old Benson Polytechnic High School.
The specialized school draws students from all over the city to focus on career technical education (CTE). Funded by a 2017 voter-approved bond, Benson Tech is undergoing a massive modernization led by Bassetti Architects with site design by Mayer/Reed. The design team is collaborating through an integrated project delivery process with Andersen Construction.

Mayer/Reed’s site design respects the historic school’s classic symmetry while incorporating accessibility and flexible-use spaces throughout. Connected to the student commons, an internal courtyard provides a plaza and stadium seating for dining, group studies and small events. On the building’s east side, the CTE courtyard is a multi-faceted, programmable space that prioritizes student work areas and outdoor classrooms.

The three-year construction process also includes an adjacent new 85,000 SF multi-story building to house the school district’s Multiple Pathways to Graduation (MPG) program. The school will be a distinct learning community designed to support various alternative education options. With a focus on providing a safe and secure facility influenced by trauma-informed best practices, the MPG building and site create positive social connections and special school identity through a connection to nature and biophilic design. Mayer/Reed’s site elements include an outdoor classroom, science-oriented roof terrace, a daycare play area and connections to Buckman Field Park.
The Benson Polytechnic High School campus projects are expected to open to students and faculty in the fall of 2024.

Need some color and light in your life? The
Leading the conceptual design, a joint venture between Mayer/Reed, ZGF and VIA Architecture prepared an overview of the corridor context and history and developed proposed urban design concepts including biking and walking improvements, stormwater strategies, station configurations, structures, streetscape and system elements summarized in the report. Special strategies such as tunnels, flyovers, elevators and even an inclined elevator – a modern type of funicular – are proposed to respond to the more challenging site conditions along the route.
Throughout the process we’ve enjoyed interacting with the communities along the line. A recent series of open houses shared the concepts and collected community input which the team will use to finalize the report in anticipation of a funding bond measure. There’s still time contribute your thoughts until March 27 through 